镀膜玻璃生产工艺-离线磁控溅射镀膜

镀膜玻璃生产工艺-离线磁控溅射镀膜

1.Pre-production inspection: Check the resistance of deionized water for cleaning, the vacuum degree of the coating process chamber, target configuration, type, purity and pressure of process gases, working status of the cooling system, working status of automatic loading/unloading devices and cleaning machines, working status of production monitoring devices and online detection devices, working status of magnetron sputtering cathodes, etc.


2. Loading: Check the appearance quality, size, thickness, tin surface orientation of the glass, etc.


3. Pre-cleaning: The water temperature of the cleaning machine is controlled at 35 - 45°C. Deionized water is used in the final step to ensure that the glass surface is free of defects such as scratches, broken corners and water stains after cleaning. The drying air must be filtered.


4. Debugging: Set process parameters according to the standard sample and conduct trial production. The sample must meet indicators such as visible light transmittance, reflectance, color, color uniformity, emissivity of low-emissivity coated glass, and wear resistance. For magnetron sputtering coated glass that can be thermally processed, its thermal processing performance must also be evaluated.


5. Production process monitoring: Monitor the stability of process gases; detect the visible light transmittance, reflectance, color, color uniformity and emissivity of the coated glass; monitor the working voltage, current and power of the cathode; observe whether the cathode glow is stable; monitor the glass conveying process; conduct offline sampling inspection of products at specified frequencies.


6. Post-cleaning: Check the appearance quality of solar control coated glass and perform post-cleaning.

优势

如果您想了解玻璃产品的定制解决方案,请随时联系我们。

我们专业的团队将在24小时内解答您的疑问,每一次沟通都是为了更好地满足您的期望。我们期待与您展开对话,从这里开启透明的合作。

如果您对我们的产品感兴趣,您可以选择在这里留下您的信息,我们会尽快与您联系。